Re-Building My Studio
the floating chamber

*

new pictures are added to the top of the page

 
april 20

 

*

continued on Inside The Floating Chamber

*

april 19
- - - - - - - - - - - - - - - - - - - - -
april 18

- - - - -

- - - - -

-

april 17

- - - - -

the frame of the door

- - - - - - - -

april 16

i started with 4 of these piles...so it looks like i'm halfway... - before - - and after - - -

video

soundchecking my new "dril and screwdriver bit set"

april 15

...today i did some work on the panels (cells) - - - - -

sideview of the wall - -

2 large tubes for the ventilation units and one smaller tube for all incoming cables (power, phone, inernet, doorbel etc...)

april 13

- - - - - - - - - - - - - - -

april 12

- - - - - - - -

april 11

- - - -

-

april 10

- - - - -

april 7 continued

after a big clean up of the tiles, the drywall and the particle board, things looked quite different.

and i found my piano again !

- - - all material was moved inside because of the bad weather expected.

...and also because of the fact that in a couple of days the wall is closed between the studio and the office and from then on, no large materials can be moved through the door... - - - - -

april 7 continued
here a picture of the three windows that will be placed inside the walls of the floating chamber - - and the doors, one for the floating chamber and one for the outside of the "cage".
april 7
- - - - - - - - - - - - - - - - - - mr blomski says "screw 'em"
april 6 continued
- - - -
april 6
- - - - - - - - - - - -
april 5

assembling the frames

- - - - - - - - - - - - - -

the delivery of the goodies

- - - - - - -

april 2

 

the top layer

- - - - - - - -

april 1 continued

- - - -

the floor from below -

-

-

-

april 1
- - - - - -
march 31 continued 2
- - - - - - - - - - - - - -
march 31 continued
- -
march 31
- - - - - - - - - - -
*