Re-Building My Studio
|
|
|
the
floating chamber
|
|
|
* new pictures are added to the top of the page |
|
|
april 20
|
|
|
april 19
|
|
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- ![]() |
|
|
april 18
|
|
|
|
|
|
april 17
|
|
|
the frame of the door
|
|
|
april 16
|
|
|
i started with 4 of these piles...so it looks like i'm halfway... video |
|
|
april 15
|
|
|
...today i did some work on the panels (cells) - sideview of the wall - 2 large tubes for the ventilation units and one smaller
tube for all incoming cables (power, phone, inernet, doorbel etc...) |
|
|
april 13
|
|
|
|
|
|
april 12
|
|
|
|
|
|
april 11
|
|
|
|
|
|
april 10
|
|
|
|
|
|
april 7
continued
|
|
|
after a big clean up of the tiles, the drywall and the particle board, things looked quite different. and i found my piano again !
...and also because of the fact that in a couple of days the wall
is closed between the studio and the office and from then on, no large
materials can be moved through the door... |
|
|
april 7
continued
|
|
|
here a picture of the three windows that will be placed
inside the walls of the floating chamber
-
- and the doors, one for the floating chamber and one for the outside
of the "cage".![]() |
|
|
april 7
|
|
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- mr blomski says "screw 'em"
|
|
|
april 6 continued
|
|
-
-
-
- ![]() |
|
|
april 6
|
|
-
-
-
-
-
-
-
-
-
-
-
- ![]() |
|
|
april 5
|
|
|
assembling the frames
|
|
|
the delivery of the goodies
|
|
|
april 2
|
|
|
the top layer
|
|
|
april 1
continued
|
|
|
the floor from below -
|
|
|
april 1
|
|
-
-
-
-
-
- ![]() |
|
|
march 31
continued 2
|
|
-
-
-
-
-
-
-
-
-
-
-
-
-
- ![]() |
|
|
march 31
continued
|
|
-
- ![]() |
|
|
march 31
|
|
-
-
-
-
-
-
-
-
-
-
- |
|
|
*
|