* continued from The Floating Chamber * next page InsideTheFloatingChamber JUNE * new pictures are added to the top of the page |
|
|
may 30
|
|
|
|
|
|
may 29
|
|
-
-
-
-
-
-
- ![]() |
|
|
may 28 continued
|
|
-
-
-
-
-
-
-
-
-
-
-
- ![]() |
|
|
may 28
|
|
|
the plan for today; 1 closing the last part of the ceiling with particle board with the help of James (JayCee) 2 starting in the small section with the layer of PVC plastic
the plastic is supposed to prevent any moist from breathing etc to leave the studio and enter the walls of the floating chamber. good ventilation will be very important now, not only for the supply of fresh air inside the studio but also for the moist to leave the room... more on that in a later post |
|
|
may 27
|
|
|
the last layers of rockwool where put in the ceiling today yeah !!!
also the last piece of particle board for the walls was attached... another yeah !!! just 2 small parts to do on the ceiling, i hope to finish them tomorrow
sealing the openings between the boards
|
|
|
may 23
|
|
|
the particle boards where screwed to the ceiling but first some kit was applied to each wooden beam, this way each separate "cell" was sealed off
|
|
|
may 22
|
|
|
the walls of the floating chamber are almost ready... as far as the first layer (particle board) concerns.
i stuffed some more rockwool in the ceiling
i had to remove the plastic pipe that was intended as second ventilation outlet because it was a serious sound leak. ok...new plan... so i gathered some stuff and did it all over again with a flexible tube, this time packed in rockwool...
f i n i ( i hope it works now ! ) |
|
|
may 21
|
|
|
|
|
|
may 18
|
|
-
-
- ![]() |
|
|
may 17
|
|
-
-
-
-
-
-
-
-
-
- |
|
|
may 16
|
|
-
-
-
-
-
-
-
-
-
-
-
-
-
- ![]() |
|
|
may 15
|
|
|
i started with the backside today the particle boards where attached. lots of glue/kit and screws
also some work was done on the door
here a closer view. the thickness is now 9 cm (4 cm original door + 5 cm layer of rockwool) i'm aiming at another 7 cm more (another 5 cm of rockwool plus 1,2 mm of particle board) the final layer should be carpet or something like that - -
|
|
|
may 14
|
|
|
here the first preparations for thickening the door both doors need more mass to absorb sound, so i started with the outer door first here you can see the first layer of rockwool, 5 cm, within a wooden frame, attached to the door
and here a test with large rubber "weather" seals the rubber is 2 x 2,5 cm and will be placed on 3 sides of the door i'm not sure how to do fix the bottom of the door, yet...
|
|
|
may 12
|
|
|
an overview from different angles the blue markings are made to point out the position of the beams, a tool to help adjusting the particle boards later on.
|
|
|
may 09
|
|
-
- ![]() |
|
|
may 06
|
|
-
-
-
-
-
-
-
-
- ![]() |
|
|
april 29
|
|
|
new material was brought, 14 particle boards and 35 drywall... oh well...here we go again !
|
|
|
april 25
|
|
-
-
- ![]() |
|
|
april 24
|
|
|
april 24
|
|
|
Today Loek worked on the doors and all the woodwork that comes with it
also today i bought some more acoustic ceiling tiles (second hand)
i'm gonna fill up the ceiling with them. when all is ready there will be something like 300 square meters of tiles in the studio (floor/walls/ceiling) so i found myself cutting that rockwool again on a sunny aftermoon
|
|
|
april 22
|
|
-
-
- ![]() |
|
|
april 21
|
|
|
|
|
|
april 20
|
|
|
pictures of the windows
before and after finishing it (like placing the second set of windows)
|
|
|
|
|
|
then the windows where
placed
|
|
|
|
|
|
|
|
|
*
|
|