Re-Building My Studio
|
|
|
ventilation
|
|
|
may 22
|
|
|
i had to remove the plastic pipe that was intended as second ventilation outlet because it was a serious sound leak. ok...new plan... so i gathered some stuff and did it all over again with a flexible tube, this time packed in rockwool...
f i n i ( i hope it works now ! ) |
|
|
*
|
|
|
april 22
|
|
- ![]() |
|
|
april 20
|
|
|
april 11
|
|
|
april 10
|
|
|
april 6 view from behind the wall
- |
|
|
april 5
|
|
-
-
-
-
- ![]() |
|
|
april 4
|
|
|
today i worked on one of the main air outlets situated in the corner (see #3 on the drawing below) it's a box of 60 x 51 cm (height 16 cm) filled with rockwool and a flexible tube (10 cm x 300 cm)
|
|
|
april 2
|
|
|
1 + 2 tubes to ventilate the space between the inside of the (outside) wall and the floating chamber.
3 one of the main air outlets
|
|
|
march 22 - march
23 - march 24
|
|
-
-
-
-
- ![]() |
|
|
inside, front |
|
|
march 21
|
|
| last night and today I worked on the ventilation for the inside (of the floating chamber) as well as outside the chamber (the space inbetween the outside walls and the floating chamber) | |
|
here some picts of the
ventilation inbetween the outside walls and the chamber
|
|
|
|
|
|
*
|