are added to the top of the page
|
|
|
april 4 sealed off the last "leaks" at the bottom of the drywall with concrete
|
|
|
march
22
|
|
-
-
- ![]() |
|
|
march
21
|
|
|
today, Loek, James and me will start with the first layer for the ceiling; particle board we've got 12 boards of 125 x 250 x 12 mm see the pictures on the "CEILING" page |
|
|
march 20 all walls, except left and right from the door, are now filled with rockwool the upper part, close to the ceiling, will be finished after the particle board is attached to the ceiling |
|
-
-
-
- -
-
- ![]() |
|
|
march
19
|
|
|
-
-
-
|
|
|
march 18 right, back to the initial plan more rockwool !
in the coming days i will put one layer (5 cm) of rockwool between the (original) walls and the drywall i just need to unscrew the upper screws and lower the rockwool in like the game 4-in-a-row...
|
|
|
-
|
|
|
march 14 continued
|
|
|
today we roughly finished the walls. that means, drywall on all walls in rows of 260 x 60 cm the total length of the walls is approx. 270 cm so the top row will be put on later, after the ceiling is ready. this way the layers of the wall and ceiling cross each other, thus covering any unwanted openings between the boards. |
|
|
details
|
|
-
-
-
-
-
- ![]() |
|
|
let's go...
|
|
|
here they are ! the gyproc moisture resistant drywall ok, they're not green as intended but the specifications are the same. (+ 7 particle boards)
|
|
|
march 14 waiting for the arrival of the greenboard (drywall) 62 plates of 260 x 60 cm (thickness 12,5 mm) and 12 particle boards of 250 x 125 cm (12,5 mm) they are scheduled to be delivered this afternoon and should cover the walls and the ceiling |
|
|
march 5 - march 13 |
|
|
all is ready now for the greenboard (drywall) the "raster" on the walls (don't know a better english word for it) are attached 60 cm apart for the greenboard (60 cm wide) |
|
|
march
13
|
|
-
-
-
-
-
-
-
-
-
-
-
- ![]() |
|
- ![]() |
|
|
|
|
|
march 12 the aid troops Loek came in to help out !
|
|
|
march 10 - 11 - 12 got the flu @X&*$^&% that means; no work :-( (not much to rock then...)
|
|
|
march 5 - 9
i decided to go for the rubber tiles so i cut them up in small squares - also had a meeting with Loek on the wednesday 7th we discussed the walls, the ceiling, ventilation, the floating chamber and all the materials. Loek is gonna help out with his skills so it's time to rock ! - not much work done otherwise had other stuff to do like preparing 2 new releases |
|
-
-
- ![]() |
|
|
march 4
|
|
|
ok, i tried something else it was actually my first idea so i gave it a try again i cut up a large rubber tile and use this as isolation between the gipsum board and the walls (and also the ceiling, see pictures)
the wall - and the ceiling -
|
|
|
march 3 the next step. *experimenting with materials for the walls* a new wall / layer of greenboard (gipsum board) is planned. it will be attached to the walls on laths. now to prevent resonation, rubber material will be put inbetween the greenboard and the laths. the bottom of the greenboard, placed on the concrete floor, should be isolated with some kind of rubber material to prevent resonation. below an idea that i am working on
|
|
|
drawing |
|
![]() |
|
|
|
|